Bienvenido! Entrar Crear un nuevo perfil

Avanzado

Floor soaked in water treatment

Enviado por linan110112 
Floor soaked in water treatment
04-July-2016 06:05
Look how the floor baseboard is installed, the fence built with pallets floor is now generally used baseboard snap to install, snap-in installation of floor baseboard moldings put carefully removed. If the baseboard floor with nails or glue installation, you can pry tool. Wood flooring removal process is relatively simple, using a flat-blade screwdriver to pry the baseboard, and then along the edge of the baseboard pry the corner of the floor and removed. While the removal of solid wood flooring, baseboard removal after the first still from the corner began to use starting hammer to pry out of wood. Press the plastic motorhome floor floor back to back manner (Please carefully clean the surface of the floor), laminated layers, heavy objects on it. Placed in ventilated, dry place to dry naturally, available fan blowing, but avoid baked or direct sunlight.

After drying the pallet deck ideas floor and so on (for about 7-15 days, depending on the length of time the local environment humidity and extent of the recovery floor), measuring the thickness of the floor, check the deformation (such as twisted solid wood, tile change, etc.).

?Can be returned to the floor resurfacing, a slight deformation of the floor can be a serious change in the furniture shop or saw or below does not affect the overall appearance of the area. Disassembly and re-flooring, certainly there will be some loss. Owners need to composite deck material in Corvallis flooring loss situation, appropriate to add some floor.
Lo siento, sólo pueden enviar mensajes si está registrado.

Picar aquí para entrar