Prepare the floor before the preparation of moisture-proof preparedness

Enviado por linan110112 
Prepare the floor before the preparation of moisture-proof preparedness
02-November-2017 02:24
<P>In the wood floor paving before the preparation of moisture-proof, more conducive to the future of wood floor moisture-proof effect. Material handling, the ground treatment of each link can not be ignored, do a good job in every moisture-proof links,aluminium composite panel cladding philippines so paving the wooden floor is both beautiful and durable. The following Xiaobian to tell you what should be prepared before the board paving work, pay attention to what the details.</P>
<P>Material preservation is important. The flooring material should be laid at room temperature for two days before paving. In order to better moisture,wpc flower box board the floor should be stored in a ventilated and dry place, and protected with plastic film. If the purchase of materials has been on the tide, and can no longer be used, should not save money, will be on the tide of wood flooring and then use. Such a wooden floor is not only easy to mold, life will be greatly reduced.</P>
<P>Material to be moisture-proof. Buy the floor before the laying of a moisture-proof treatment. In the back of the floor coated with a layer of moisture-proof paint to prevent paving the ground wet affect the floor,composite decking prices reviews resulting in the situation of the floor hollowing.</P>
Lo siento, sólo pueden enviar mensajes si está registrado.

Picar aquí para entrar