Floor problems, mostly because the material is not a loophole but construction. So everyone in the decoration of the time, we must keep a close eye operation of the workers in the wood shop floor and bamboo floor when the small problems do not ignore.
High brand solid wood flooring solid wood flooring a pioneer, construction points
1. Dry and flat ground;
2. Solid wood flooring, bamboo flooring in the pavement before the fight keel, the keel to keep dry, paved to leave enough expansion joints between the mats, floors and walls; strengthening should shop and mats, floors and walls before floor coverings enough to stay between expansion joints, floor to floor glued (lock floor without adhesive bonding).
Second, Common Problems
Decorative flooring material most prone to problems of products, but also consumer complaints most products, especially wood floor.
Solid wood flooring because it is a natural material, is easy with the change of air temperature, humidity changed and so is the focus of complaints.
For such problems, we need to introduce your business in the product, the installation process and other aspects of strict control.
1. Water temperature is too high so that the floor drying, cracks; humidity is too large, expansive floor drum phenomenon occurred since;
2. Color problem. Is a normal phenomenon, because the difference between the coverage of trees, lots of the same species of the floor will be varying degrees of color.
Bamboo flooring construction points:
1) the amount of good size, reasonable timber. All truncated plate. Its cross-section must be sealed with varnish to prevent moisture.
2) at the start laying the bamboo flooring, the fir (1.2 × 1.2cm) placed around the foot of the wall portion, longitudinal begin paving. Bamboo flooring can be directly laid on the keel, the keel may be more scientific capped with a layer of plywood before installing bamboo flooring. The first piece of bamboo flooring tongue and groove groove side firmly tied fir. Followed by a moderate face connection bump knock tight close shop. According to board the short length of the room need to cut off the wall shop in the transverse section. Bamboo flooring laying transverse joints staggered.
3) After the overall installed bamboo flooring, cedar board around the foot of the wall portion removed.
4) surrounded by the wall the whole piece floor manor gussets to cover the expansion joints. Wood screws or bamboo stick to the gusset wall-mounted wood screws or available at nearly bamboo color paint (or varnish) paint points. The last plane to angle plates decorated with the same thickness of the big line.
5) between the bamboo flooring can not be too tight, to prevent extrusion; the back of the bamboo flooring at the contact with the ground may not be used glue; installation will directly affect the overall effect of the floor, hoping to please experienced carpenter construction.